UC Davis Health, Parking Structure 5

Client

UC Davis Health

Location

Sacramento, California

Completion

May 2023

Certification

Targeting Parksmart Gold

Size

6 Stories; 311,048 Square Feet; 957 Stalls

Cost

$44 Million

Delivery Method

Design-Build

Subterranean Entry

On UC Davis Health’s Sacramento campus, Parking Structure 5 provides exceptional space for patients, visitors, and staff to feel safe, clearly find their way, and efficiently park their vehicle in a very open and day-lit space. With all vehicles entering and exiting the structure through a subterranean entrance off the adjacent mid-block intersection, the cross-campus flow of pedestrians and bicycles is uninterrupted.

Serving the Cancer Center and new California Tower, the structure brings stalls with a flexible layout, focused on accessibility on every floor with the potential to accommodate loading areas for patient drop-off inside the structure. Using architectural precast concrete, extruded aluminum fins, solid and perforated aluminum panels and fully glazed elevator towers, the architectural form and material expression celebrate the high-quality spaces and representation of the design-focus for the medical campus.

Photovoltaic panels installed on the top floor provide electricity to the structure. There is also short term bike stalls, and long-term secure bike parking for 125 inside the structure.

Parking Structure 5 is designed to achieve Parksmart Gold certification.

Sectors

Healthcare

Subscribe to learn about our latest projects, news + updates.